Search

Publisher: Baton Rouge, LA : Louisiana Transportation Research Center [ All ]

Page 6 of 39

  Title Copies
Design and Construction of a Bonded Fiber Concrete Overlay of CRCP (Louisiana, Interstate Route 10, August 1990) 
Year: 1993 
Call No: Report No. 266 
Design and Development of Data Acquisition System for the Louisiana Accelerated Loading Device 
Year: 1992 
Call No: Report No. 250 
Design Considerations for Bridge Deck Joint Sealing System 
Year: 1992 
Call No: Report No. 245 
Design of Lane Merges at Rural Freeway Construction Work Zones 
Year: 2012 
Call No: Report No. 484 
Design Procedures for Heat Straightening Repairs: An Engineering Guide 
Year: 1992 
Call No: Report No. 252 
Designing a Comprehensive Model to Evaluate Outsourcing of Louisiana DOTD Functions and Activities 
Year: 2002 
Call No: Report No. 358 
Designing Pedestrian Facilities for Accessibility 
Year: 2008 
Detection of Fly Ash in Portland Cement-Fly Ash Concrete 
Year: 1991 
Call No: Report No. 247 
Determination and Treatment of Substances in Runoff in a Controlled Highway System (Cross Lake) 
Year: 2003 
Call No: Report No. 346 
Determination of Appropriate Funding for Maintenance 
Year: 1997 
Call No: Report No. 302